ORIGINAL SENATE                                          

FILE   NO.  0047

 

ENROLLED ACT NO. 7,  SENATE

 

FIFTY-SIXTH LEGISLATURE OF THE STATE OF WYOMING

2001 GENERAL SESSION

 

 

 

 

AN ACT relating to water development projects; authorizing
construction of designated water projects; describing
projects; specifying terms and conditions of funding for
projects; providing restrictions relating to sales of water
and operation of projects; providing appropriations;
modifying project descriptions, terms of appropriations for
various specified prior projects; and providing for an
effective date.

 

Be It Enacted by the Legislature of the State of Wyoming:

 

Section 1.  W.S. 99-3-501 through 99-3-504 are created
to read:

 

ARTICLE 5

2001 CONSTRUCTION PROJECTS

[AUTHORIZATION FOR 2001 CONSTRUCTION PROJECTS]

 

99-3-501.  Definitions.

 

The definitions in W.S. 99-3-101 apply to this article.

 

99-3-502.  General authorization.

 

The provisions of W.S. 99-3-102 apply to this article.

 

[2001 NEW DEVELOPMENT PROJECTS]

 

99-3-503.  Level III construction projects – new
development.

 

(a)  Authorization is granted for the Level III new
development construction projects identified in this
section, subject to the general conditions specified in
W.S. 99-3-103.

 

Page  1

 

 

 

(b)  Project - Oakley Water Supply Project:

 

(i)  Project sponsor: Oakley Improvement and
Service District;

 

(ii)  Project purpose: Rural and domestic water
supply;

 

(iii)  Project description: A water supply
pipeline valves, and appurtenances necessary to make the
project function in the manner intended;

 

(iv)  Total project budget: Three hundred fifty-
two thousand dollars ($352,000.00);

 

(v)  Project grant: The state of Wyoming shall
grant to the sponsor from water development account I
through the commission for the design, permit procurement,
project land procurement, construction engineering, and
construction of the project an amount not to exceed one
hundred seventy-six thousand dollars ($176,000.00) or fifty
percent (50%) of the actual development costs, whichever is
less;

 

(vi)  Appropriation: There is appropriated from
water development account I to the commission one hundred
seventy-six thousand dollars ($176,000.00) or as much
thereof as is necessary to carry out the purpose of this
subsection. Unexpended funds appropriated under this
subsection shall revert to water development account I on
July 1, 2005; and

 

(vii)  Special conditions:

 

Page  2

 

 

 

(A)  The sponsor is responsible for
acquiring fifty percent (50%) of the total project budget
from other sources;

 

(B)  The project is expressly contingent on
formation of the Oakley Improvement and Service District
and approval of a project financing plan by an election
held pursuant to the Improvement and Service District Act,
W.S. 18-12-101 through 18-12-140, and the Special Districts
Elections Act of 1994, W.S. 22-29-101 through 22-29-408.

 

(c)  Project – Wheatland Water Supply Rehabilitation
Project:

 

(i)  Project sponsor: Town of Wheatland;

 

(ii)  Project purpose: Municipal and domestic
water supply;

 

(iii)  Project description: Construction of a new
well, installation of new storage facilities and piping to
connect the improvements to the town's water system and
appurtenances necessary to make the project function in the
manner intended;

 

(iv)  Total project budget: Eight hundred fifty-
four thousand dollars ($854,000.00);

 

(v)  Project grant: The state of Wyoming shall
grant to the sponsor from water development account I
through the commission for the design, permit procurement,
project land procurement, construction engineering, and
construction of the project an amount not to exceed two
hundred twenty-two thousand dollars ($222,000.00) or
twenty-six percent (26%) of the actual development costs,
whichever is less;

 

Page  3

 

 

 

(vi)  Appropriation: There is appropriated from
water development account I to the commission two hundred
twenty-two thousand dollars ($222,000.00) or as much
thereof as is necessary to carry out the purpose of this
subsection. Unexpended funds appropriated under this
subsection shall revert to water development account I on
July 1, 2005; and

 

(vii)  Special condition: The sponsor is
responsible for acquiring seventy-four percent (74%) of the
total project budget from other sources.

 

[REHABILITATION CONSTRUCTION PROJECTS]

 

99-3-504.  Level III construction projects-
rehabilitation.

 

(a)  Authorization is granted for the Level III
rehabilitation construction projects identified in this
section, subject to the general conditions specified in
W.S. 99-3-104.

 

(b)  Project – Baggs Water Supply Rehabilitation
Project:

 

(i)  Project sponsor: Town of Baggs;

 

(ii)  Project purpose: Municipal and domestic
water supply;

 

(iii)  Project description: Diversion and intake
facilities and other miscellaneous appurtenances necessary
to make the project function in the manner intended;

 

Page  4

 

 

 

(iv)  Total project budget: One hundred eighty-
four thousand dollars ($184,000.00);

 

(v)  Project grant: The state of Wyoming shall
grant to the sponsor from water development account II
through the commission for the design, permit procurement,
project land procurement, construction engineering, and
construction of the project an amount not to exceed ninety-
two thousand dollars ($92,000.00) or fifty percent (50%) of
the actual development costs, whichever is less;

 

(vi)  Appropriation: There is appropriated from
water development account II to the commission ninety-two
thousand dollars ($92,000.00) or as much thereof as is
necessary to carry out the purpose of this subsection.
Unexpended funds appropriated under this subsection shall
revert to water development account II on July 1, 2005; and

 

(vii)  Special condition: The sponsor is
responsible for acquiring fifty percent (50%) of the total
project budget from other sources.

 

(c)  Project – Bridger Valley Intake Structure
Rehabilitation Project:

 

(i)  Project sponsor: Bridger Valley Joint Powers
Board;

 

(ii)  Project purpose: Municipal and domestic
water supply;

 

(iii)  Project description: Rehabilitation of the
intake and raw water diversion facility and appurtenances
necessary to make the project function in the manner
intended;

 

Page  5

 

 

 

(iv)  Total project budget: Two hundred seventy-
six thousand dollars ($276,000.00);

 

(v)  Project grant: The state of Wyoming shall
grant to the sponsor from water development account II
through the commission for the design, permit procurement,
project land procurement, construction engineering, and
construction of the project an amount not to exceed one
hundred thirty-eight thousand dollars ($138,000.00) or
fifty percent (50%) of the actual development costs,
whichever is less;

 

(vi)  Appropriation: There is appropriated from
water development account II to the commission one hundred
thirty-eight thousand dollars ($138,000.00) or as much
thereof as is necessary to carry out the purpose of this
subsection. Unexpended funds appropriated under this
subsection shall revert to water development account II on
July 1, 2005; and

 

(vii)  Special condition:  The sponsor is
responsible for acquiring fifty percent (50%) of the total
project budget from other sources.

 

(d)  Project – Cheyenne South Crow Dam Water Supply
Rehabilitation Project:

 

(i)  Project sponsor: City of Cheyenne;

 

(ii)  Project purpose: Municipal and domestic
water supply;

 

(iii)  Project description: Final design
services, plans and specifications, for rehabilitating the
South Crow Dam, for adding a supervisory control and data
acquisition control system, for pipelines needed to connect

 

Page  6

 

 

 

to the city's treatment and conveyance system and for
appurtenances necessary to make the project function in the
manner intended;

 

(iv)  Total project budget: Seventy thousand
dollars ($70,000.00);

 

(v)  Project loan: The state of Wyoming shall
loan to the sponsor from water development account II
through the commission for final design, plans and
specifications of the project an amount not to exceed
thirty-five thousand dollars ($35,000.00) or fifty percent
(50%) of the actually development costs, whichever is less,
for a term of twenty (20) years from the date the
commission determines project benefits accrue to the
sponsor, at an annual rate of seven and one-quarter percent
(7.25%);

 

(vi)  Project grant: The state of Wyoming shall
grant to the sponsor from water development account II
through the commission for the final design, plans and
specifications for the project an amount not to exceed
thirty-five thousand ($35,000.00) or fifty percent (50%) of
the actual development costs, whichever is less; and

 

(vi)  Appropriation: There is appropriated from
water development account II to the commission seventy
thousand dollars ($70,000.00) or as much thereof as is
necessary to carry out the purpose of this subsection.
Unexpended funds appropriated under this subsection shall
revert to water development account II on July 1, 2005.

 

(e)  Project – Dayton Water Supply  Rehabilitation
Project:

 

(i)  Project sponsor: Town of Dayton;

 

Page  7

 

 

 

(ii)  Project purpose: Municipal and rural
domestic water supply;

 

(iii)  Project description: Replacement of an
existing transite pipeline, installation of a new booster
station, installation of pipeline to an existing booster
station and appurtenances necessary to make the project
function in the manner intended;

 

(iv)  Total project budget: Eight hundred eighty
thousand dollars ($880,000.00);

 

(v)  Project grant: The state of Wyoming shall
grant to the sponsor from water development account II
through the commission for the design, permit procurement,
project land procurement, construction engineering, and
construction of the project an amount not to exceed four
hundred forty thousand dollars ($440,000.00) or fifty
percent (50%) of the actual development costs, whichever is
less;

 

(vi)  Appropriation: There is appropriated from
water development account II to the commission four hundred
forty thousand dollars ($440,000.00) or as much thereof as
is necessary to carry out the purpose of this subsection.
Unexpended funds appropriated under this subsection shall
revert to water development account II on July 1, 2005; and

 

(vii)  Special condition: The sponsor is
responsible for securing fifty percent (50%) of the project
budget from other sources.

 

(f)  Project – Encampment Raw Water Line
Rehabilitation Project:

 

Page  8

 

 

 

(i)  Project sponsor: Town of Encampment;

 

(ii)  Project purpose: Municipal and domestic
water supply;

 

(iii)  Project description: Final design
services, plans and specifications, for the replacement of
the remaining nonpiped portion of the raw water conveyance
system extending from the North Fork of the Encampment
River to the town's water system and for appurtenances
necessary to make the project function in the manner
intended;

 

(iv)  Total project budget: Sixty thousand
dollars ($60,000.00);

 

(v)  Project loan: The state of Wyoming shall
loan to the sponsor from water development account II
through the commission for final design, plans and
specifications of the project an amount not to exceed
thirty thousand dollars ($30,000.00) or fifty percent (50%)
of the actual development costs, whichever is less, for a
term of twenty (20) years from the date the commission
determines project benefits accrue to the sponsor, at an
annual rate of seven and one-quarter percent (7.25%);

 

(vi)  Project grant: The state of Wyoming shall
grant to the sponsor from water development account II
through the commission for the final design, plans and
specifications for the project an amount not to exceed
thirty thousand dollars ($30,000.00) or fifty percent (50%)
of the actual development costs, whichever is less; and

 

(vii)  Appropriation: There is appropriated from
water development account II to the commission sixty
thousand dollars ($60,000.00) or as much thereof as is

 

Page  9

 

 

 

necessary to carry out the purpose of this subsection.
Unexpended funds appropriated under this subsection shall
revert to water development account II on July 1, 2005.

 

(g)  Project – Gillette Central Pressure Zone
Isolation Rehabilitation Project:

 

(i)  Project sponsor: City of Gillette;

 

(ii)  Project purpose: Municipal and domestic
water supply;

 

(iii)  Project description: Final design
services, plans and specifications, for improving fire
flows, meeting Safe Drinking Water Act minimum pressure and
disinfection requirements and for appurtenances necessary
to make the project function in the manner intended;

 

(iv)  Total project budget: One hundred fifty
thousand dollars ($150,000.00);

 

(v)  Project grant: The state of Wyoming shall
grant to the sponsor from water development account II
through the commission for the final design, plans and
specifications for the project an amount not to exceed
seventy-five thousand ($75,000.00) or fifty percent (50%)
of the actual development costs, whichever is less;

 

(vi)  Appropriation: There is appropriated from
water development account II to the commission seventy-five
thousand dollars ($75,000.00) or as much thereof as is
necessary to carry out the purpose of this subsection.
Unexpended funds appropriated under this subsection shall
revert to water development account II on July 1, 2005; and

 

Page 10

 

 

 

(vii)  Special condition: The sponsor is
responsible for acquiring fifty percent (50%) of the total
project budget from other sources.

 

(h)  Project – Hugus-Mullison Ditch Rehabilitation
Project:

 

(i)  Project sponsor: Hugus Watershed Improvement
District;

 

(ii)  Project purpose: Irrigation, seepage and
flood control;

 

(iii)  Project description: Canal lining,
replacement of culverts at street crossings to increase the
capacity of the ditch and appurtenances necessary to make
the project function in the manner intended;

 

(iv)  Total project budget: Six hundred fifty
thousand dollars ($650,000.00);

 

(v)  Project grant: The state of Wyoming shall
grant to the sponsor from water development account II
through the commission for the design, permit procurement,
project land procurement, construction engineering, and
construction of the project an amount not to exceed three
hundred twenty-five thousand dollars ($325,000.00) or fifty
percent (50%) of the actual development costs, whichever is
less;

 

(vi)  Appropriation: There is appropriated from
water development account II to the commission three
hundred twenty-five thousand dollars ($325,000.00) or as
much thereof as is necessary to carry out the purpose of
this subsection. Unexpended funds appropriated under this

 

Page 11

 

 

 

subsection shall revert to water development account II on
July 1, 2005; and

 

(vii)  Special condition: The sponsor is
responsible for acquiring fifty percent (50%) of the total
project budget from other sources.

 

(j)  Project – Laramie North Side Water Supply
Rehabilitation Project:

 

(i)  Project sponsor: City of Laramie;

 

(ii)  Project purpose: Municipal;

 

(iii)  Project description: Permit procurement,
right-of-way acquisition, final design services, plans and
specifications required to rehabilitate an existing twenty
(20) inch diameter pipeline, to add additional storage
facilities in east Laramie, to connect the east side
storage to the Laramie water system, and for appurtenances
necessary to make the project function in the manner
intended;

 

(iv)  Total project budget: Nine hundred seventy
thousand dollars ($970,000.00);

 

(v)  Project loan: The state of Wyoming shall
loan to the sponsor from water development account II
through the commission for permit procurement, right-of-way
acquisition, final design, plans and specifications of the
project an amount not to exceed four hundred eighty-five
thousand dollars ($485,000.00) or fifty percent (50%) of
the actual development costs, whichever is less, for a term
of twenty (20) years from the date the commission
determines project benefits accrue to the sponsor, at an
annual rate of seven and one-quarter percent (7.25%);

 

Page 12

 

 

 

(vi)  Project grant: The state of Wyoming shall
grant to the sponsor from water development account II
through the commission for permit procurement, right-of-way
acquisition, final design, plans and specifications of the
project an amount not to exceed four hundred eighty-five
thousand dollars ($485,000.00) or fifty percent (50%) of
the actual development costs, whichever is less; and

 

(vii)  Appropriation: There is appropriated from
water development account II to the commission nine hundred
seventy thousand dollars ($970,000.00) or as much thereof
as is necessary to carry out the purpose of this
subsection. Unexpended funds appropriated under this
subsection shall revert to water development account II on
July 1, 2005.

 

(k)  Project – Pine Haven Pipeline Rehabilitation
Project:

 

(i)  Project sponsor: Town of Pine Haven;

 

(ii)  Project purpose: Municipal;

 

(iii)  Project description: The project includes
installation of pipelines to connect the town's existing
well directly to the storage system, to tie the storage
system to the distribution system and appurtenances
necessary to make the project function in the manner
intended;

 

(iv)  Total project budget: Two hundred thirty-
five thousand dollars ($235,000.00);

 

(v)  Project loan: The state of Wyoming shall
loan to the sponsor from water development account II

 

Page 13

 

 

 

through the commission for the design, permit procurement,
project land procurement, construction engineering, and
construction of the project an amount not to exceed one
hundred seventeen thousand five hundred dollars
($117,500.00) or fifty percent (50%) of the actual
development costs, whichever is less, for a term of thirty
(30) years from the date the commission determines project
benefits accrue to the sponsor, at an annual rate of seven
and one-quarter percent (7.25%);

 

(vi)  Project grant: The state of Wyoming shall
grant to the sponsor from water development account II
through the commission for the design, permit procurement,
project land procurement, construction engineering, and
construction of the project an amount not to exceed one
hundred seventeen thousand five hundred dollars
($117,500.00) or fifty percent (50%) of the actual
development costs, whichever is less; and

 

(vii)  Appropriation: There is appropriated from
water development account II to the commission two hundred
thirty-five thousand dollars ($235,000.00) or as much
thereof as is necessary to carry out the purpose of this
subsection. Unexpended funds appropriated under this
subsection shall revert to water development account II on
July 1, 2005.

 

(m)  Project – Powell Water Supply Rehabilitation
Project:

 

(i)  Project sponsor: City of Powell;

 

(ii)  Project purpose: Municipal and domestic
water supply;

 

Page 14

 

 

 

(iii)  Project description: Right-of-way
acquisition, final design services, including permitting
services and providing plans and specifications, for
replacing an old water storage tank, for providing
miscellaneous piping and pressure reducing valves to create
additional pressure zones to comply with the Safe Drinking
Water Act's minimum pressure requirements and for
appurtenances necessary to make the project function in the
manner intended;

 

(iv)  Total project budget: Two hundred fifty-
four thousand dollars ($254,000.00);

 

(v)  Project grant: The state of Wyoming shall
grant to the sponsor from water development account II
through the commission for the right-of-way acquisition,
final design, plans and specifications for the project an
amount not to exceed one hundred twenty-seven thousand
dollars ($127,000.00) or fifty percent (50%) of the actual
development costs, whichever is less;

 

(vi)  Appropriation: There is appropriated from
water development account II to the commission one hundred
twenty-seven thousand dollars ($127,000.00) or as much
thereof as is necessary to carry out the purpose of this
subsection. Unexpended funds appropriated under this
subsection shall revert to water development account II on
July 1, 2005; and

 

(vii)  Special condition: The sponsor is
responsible for acquiring fifty percent (50%) of the total
project budget from other sources.

 

(n)  Project – Riverton Raw Water Supply
Rehabilitation Project:

 

Page 15

 

 

 

(i)  Project sponsor: City of Riverton;

 

(ii)  Project purpose: Municipal and domestic
water supply;

 

(iii)  Project description: Final design
services, plans and specifications, for rehabilitating a
raw water conveyance system which serves the Riverton
Valley Irrigation District, the LeClair Irrigation
District, and the City of Riverton and for appurtenances
necessary to make the project function in the manner
intended;

 

(iv)  Total project budget: One hundred seventy
thousand dollars ($170,000.00);

 

(v)  Project grant: The state of Wyoming shall
grant to the sponsor from water development account II
through the commission for the final design, plans and
specifications for the project an amount not to exceed
eighty-five thousand dollars ($85,000.00) or fifty percent
(50%) of the actual development costs, whichever is less;

 

(vi)  Appropriation: There is appropriated from
water development account II to the commission eighty-five
thousand dollars ($85,000.00) or as much thereof as is
necessary to carry out the purpose of this subsection.
Unexpended funds appropriated under this subsection shall
revert to water development account II on July 1, 2005; and

 

(vii)  Special condition: The sponsor is
responsible for acquiring fifty percent (50%) of the total
project budget from other sources.

 

(o)  Project – Sheridan Raw Water Supply
Rehabilitation Project:

 

Page 16

 

 

 

(i)  Project sponsor: City of Sheridan;

 

(ii)  Project purpose: Municipal and domestic
water supply;

 

(iii)  Project description: Final design
services, plans and specifications, for rehabilitating a
raw water conveyance system which serves the city golf
course and for appurtenances necessary to make the project
function in the manner intended;

 

(iv)  Total project budget: One hundred thousand
dollars ($100,000.00);

 

(v)  Project grant: The state of Wyoming shall
grant to the sponsor from water development account II
through the commission for the final design, plans and
specifications for the project an amount not to exceed
fifty thousand dollars ($50,000.00) or fifty percent (50%)
of the actual development costs, whichever is less;

 

(vi)  Appropriation: There is appropriated from
water development account II to the commission fifty
thousand dollars ($50,000.00) or as much thereof as is
necessary to carry out the purpose of this subsection. 
Unexpended funds appropriated under this subsection shall
revert to water development account II on July 1, 2005; and

 

(vii)  Special condition: The sponsor is
responsible for acquiring fifty percent (50%) of the total
project budget from other sources.

 

(p)  Project – Wamsutter Water Supply Rehabilitation
Project:

 

Page 17

 

 

 

(i)  Project sponsor: Town of Wamsutter;

 

(ii)  Project purpose: Municipal and domestic
water supply;

 

(iii)  Project description: The project includes
refinancing of an existing state land and investment board
emergency loan that funded the replacement of an old three
(3) inch diameter transmission line, funding of the
replacement of another existing transmission pipeline from
the water supply well to town and appurtenances necessary
to make the project function in the manner intended;

 

(iv)  Total project budget: Two hundred eighty
thousand dollars ($280,000.00);

 

(v)  Project grant: The state of Wyoming shall
grant to the sponsor from water development account II
through the commission for refinancing the state land and
investment board emergency loan for replacing an existing
three (3) inch diameter pipeline, and for the design,
permit procurement, project land procurement, construction
engineering, and construction of a new rehabilitation
project an amount not to exceed one hundred forty thousand
dollars ($140,000.00) or fifty percent (50%) of the actual
development costs, whichever is less;

 

(vi)  Appropriation: There is appropriated from
water development account II to the commission one hundred
forty  thousand dollars ($140,000.00) or as much thereof as
is necessary to carry out the purpose of this subsection.
Unexpended funds appropriated under this subsection shall
revert to water development account II on July 1, 2005; and

 

Page 18

 

 

 

(vii)  Special condition: The sponsor is
responsible for acquiring fifty percent (50%) of the total
project budget from other sources.

 

[AMENDMENTS TO PRIOR PROJECTS]

 

Section 2.  [Amendments to the Buffalo Valley Water
Supply Project] W.S. 99-3-203(b) is amended to read:

 

99-3-203.  Level III construction projects - new
development.

 

(b)  Project - Buffalo Valley Water Supply Project:

 

(i)  Project sponsor: Buffalo Valley Water
District;

 

(ii)  Project purpose: Rural and domestic water
supply;

 

(iii)  Project description: A well, pipeline,
storage facilities, valves and appurtenances necessary to
make the project function in the manner intended;

 

(iv)  Total project budget: Four hundred seventy-
five thousand dollars ($475,000.00);

 

(v)  Project loan: The state of Wyoming shall
loan to the sponsor from water development account I
through the commission for the design, permit procurement,
project land procurement, construction engineering and
construction of the project an amount not to exceed one
hundred ninety thousand dollars ($190,000.00) or forty
percent (40%) of the actual development costs, whichever is
less, for a term of thirty (30) years from the date the
commission determines project benefits accrue to the

 

Page 19

 

 

 

sponsor, at an annual rate of seven and one-quarter percent
(7.25%);

 

(vi)  Project grant: The state of Wyoming shall
grant to the sponsor from water development account I
through the commission for the design, permit procurement,
project land procurement, construction engineering and
construction of the project an amount not to exceed two
hundred eighty-five thousand dollars ($285,000.00) or sixty
percent (60%) of the actual development costs, whichever is
less;

 

(vii)  Appropriation: There is appropriated from
water development account I to the commission four hundred
seventy-five thousand dollars ($475,000.00) or as much
thereof as is necessary to carry out the purpose of this
subsection. Unexpended funds appropriated under this
subsection shall revert to water development account I on
July 1, 2001 2005;

 

(viii)  Special condition: The sponsor shall
purchase the well completed during the Level II study for a
price of  six thousand two hundred sixty-four dollars
($6,264.00) or forty percent (40%) of the actual
construction costs, whichever is less. The sponsor may
purchase the well with a lump sum payment or with amortized
payments based on forty percent (40%) of the actual
construction costs for a term of thirty (30) years from the
date the commission determines project benefits accrue to
the sponsor, at an annual interest rate of seven and one-
quarter percent (7.25%).  In either event, a purchase
agreement must be completed prior to commencement of the
project. (Laws 1998, ch. 38, § 2.)

 

Section 3.  [Amendments to the Downer Neighborhood
Water Supply Project] W.S. 99-3-304(b) is amended to read:

 

Page 20

 

 

 

99-3-304.  Level III construction projects -
rehabilitation.

 

(b)  Project - Downer Neighborhood Water Supply
Rehabilitation Project:

 

(i)  Project sponsor: Downer Neighborhood
Improvement and Service District;

 

(ii)  Project purpose: Municipal and domestic
water supply;

 

(iii)  Project description: Pipelines, valves,
wells and other miscellaneous appurtenances necessary to
make the project function in the manner intended;

 

(iv)  Total project budget: Two million nine
hundred ninety-five thousand nine hundred dollars
($2,995,900.00)
Two million nine hundred ninety-nine
thousand five hundred dollars ($2,999,500.00)
;

 

(v)  Project grant: The state of Wyoming shall
grant to the sponsor from water development account II
through the commission for the design, permit procurement,
project land procurement, construction engineering and
construction of the project an amount not to exceed one
million eighty-five thousand one hundred dollars
($1,085,100.00)
one million one hundred ninety-eight
thousand one hundred dollars ($1,198,100.00)
or fifty
percent (50%) of the eligible actual development costs,
whichever is less;

 

(vi)  Appropriation: There is appropriated from
water development account II to the commission one million
eighty-five thousand one hundred dollars ($1,085,100.00)

 

Page 21

 

 

 

one million one hundred ninety-eight thousand one hundred
dollars ($1,198,100.00)
or as much thereof as is necessary
to carry out the purpose of this subsection.  Unexpended
funds appropriated under this subsection shall revert to
water development account II on July 1, 2003;

 

(vii)  Special condition: The sponsor is
responsible for securing the balance of project funding
from other sources. (Laws 1999, ch. 16, § 1.)

 

Section 4.  [Amendments to the Little Snake River
Valley Dam and Reservoir Project] W.S. 99-2-303(f) is
amended to read:

 

99-2-303.  Level III construction projects-new
development.

 

(f)  Project Little Snake River Valley Dam and
Reservoir Project:

 

(i)  Project sponsor: State of Wyoming;

 

(ii)  Project purpose: Agricultural, municipal
and domestic water supply, recreation, environmental
enhancement and mitigation for the Stage I, II and III
transbasin diversion water supply projects;

 

(iii)  Project description: Dam, outlet works,
spillways and appurtenances necessary to make the project
complete and function in the manner intended;

 

(iv)  Total project budget: Thirty million
dollars ($30,000,000.00)
Thirty-three million eight hundred
thousand dollars ($33,800,000.00)
;

 

(v)  Appropriation:

 

Page 22

 

 

 

(A)  There is appropriated from water
development account I to the commission twenty million four
hundred thousand dollars ($20,400,000.00)
twenty-four
million two hundred thousand dollars ($24,200,000.00)
or as
much thereof as is necessary to carry out the purpose of
this subsection;

 

(B)  Of the ten million dollars
($10,000,000.00) previously appropriated for funding of the
Sandstone project by 1988 Wyoming Session Laws, Chapter 79,
Section 7 [as amended by the 1989 Wyoming Session Laws,
Chapter 268, Section 2], nine million six hundred thousand
dollars ($9,600,000.00) or as much thereof as is necessary
is appropriated to and may be used by the commission to
carry out the purpose of this subsection;

 

(C)  Unexpended funds appropriated under
this subsection shall revert to water development account I
on July 1, 2001 2005.

 

(vi)  Special conditions: The construction of the
Little Snake River Valley Dam and reservoir project shall
be deemed mitigation to the Little Snake River Basin for
any and all impacts resulting from the operation of the
Stage I and Stage II transbasin diversion water supply
projects. The project sponsor shall ensure that after the
project construction is complete, the reservoir is open for
recreational use. (Laws 1993, ch. 89, § 3f; 1997, ch. 45, §
9; 1998, ch. 38, § 5.)

 

Section 5.  [Amendment to the Little Snake Small Dams
and Reservoir Project] W.S. 99-3-303(h) is amended to read:

 

99-3-303.  Level III construction projects - new
development.

 

Page 23

 

 

 

(h)  Project - Little Snake River Small Dams and
Reservoirs Project:

 

(i)  Project sponsor: Little Snake River
Conservation District;

 

(ii)  Project purpose: Multi-purpose -
agriculture, recreation;

 

(iii)  Project description: Construction of small
dams to impound water for livestock, wildlife and
recreation use;

 

(iv)  Total project budget: Two hundred fifteen
thousand dollars ($215,000.00)
Two hundred sixty-five
thousand dollars ($265,000.00)
;

 

(v)  Project loan: The state of Wyoming shall
loan to the sponsor from water development account I
through the commission for the design, permit procurement,
project land procurement, construction engineering and
construction of the project an amount not to exceed eighty-
six thousand dollars ($86,000.00)
one hundred six thousand
dollars ($106,000.00)
or forty percent (40%) of the actual
development costs, whichever is less, for a term of twenty-
five (25) years from the date the commission determines
project benefits accrue to the sponsor, at an annual
interest rate of seven and one-quarter percent (7.25%);

 

(vi)  Project grant: The state of Wyoming shall
grant to the sponsor from water development account I
through the commission for the design, permit procurement,
project land procurement, construction engineering and
construction of the project an amount not to exceed one
hundred twenty-nine thousand dollars ($129,000.00)
one

 

Page 24

 

 

 

hundred fifty-nine thousand dollars ($159,000.00) or sixty
percent (60%) of the actual development costs, whichever is
less;

 

(vii)  Appropriation: There is appropriated from
water development account I to the commission two hundred
fifteen thousand dollars ($215,000.00)
two hundred sixty-
five thousand dollars ($265,000.00)
or as much thereof as
is necessary to carry out the purpose of this subsection.
Unexpended funds appropriated under this subsection shall
revert to water development account I on July 1, 2003;

 

(viii)  Special conditions:

 

(A)  The sponsor shall deposit cash or other
securities valued at the full amount of the loan in an
escrow account, as deemed appropriate by the attorney
general, which names the commission as the beneficiary or
recipient in the event of default on the loan. Interest
earnings on cash or securities deposited in the escrow
account shall remain with the sponsor;

 

(B)  Construction of dams and reservoirs
shall be limited to all or a portion of the twelve (12)
projects identified and recommended for construction in the
Little Snake River Basin Small Reservoir Development
Project. The sponsor shall obtain the approval of the
commission prior to the construction of any individual
facility. (Laws 1999, ch. 16, § 1.)

 

Section 6.  [Amendments to the Washakie Rural Water
Supply Project] W.S. 99-3-303(k) is amended to read:

 

99-3-303.  Level III construction projects - new
development.

 

Page 25

 

 

 

(k)  Project - Washakie Rural Water Supply Project:

 

(i)  Project sponsor: Washakie Rural Improvement
and Service District;

 

(ii)  Project purpose: Rural domestic water
supply;

 

(iii)  Project description: The project consists
of a rural potable water system extending from the Hot
Springs County line on the south to the Big Horn County
line on the north and encompasses most of the private lands
along both banks of the Big Horn River. The project also
includes construction of the water transmission and
distribution system and appurtenances necessary to provide
potable water service to the McNutt Improvement and Service
District. Project components include transmission
pipelines, storage facilities, booster pumps, valves,
telemetry and appurtenances necessary to make the project
function in the manner intended;

 

(iv)  Total project budget: Eight million seven
hundred thousand dollars ($8,700,000.00)
Nine million one
hundred thousand dollars ($9,100,000.00)
;

 

(v)  Project grant: The state of Wyoming shall
grant to the sponsor from water development account I
through the commission for the design, permit procurement,
project land procurement, construction engineering and
construction of the project an amount not to exceed five
million two hundred twenty thousand dollars ($5,220,000.00)
five million four hundred sixty thousand dollars
($5,460,000.00)
or sixty percent (60%) of the actual
development costs, whichever is less;

 

Page 26

 

 

 

(vi)  Appropriation: There is appropriated from
water development account I to the commission five million
two hundred twenty thousand dollars ($5,220,000.00)
five
million four hundred sixty thousand dollars ($5,460,000.00)

or as much thereof as is necessary to carry out the purpose
of this subsection. Unexpended funds appropriated under
this subsection shall revert to water development account I
on July 1, 2004;

 

(vii)  Special conditions:

 

(A)  The sponsor is responsible for
acquiring forty percent (40%) of the total project budget
from other sources;

 

(B)  Water users in the McNutt Improvement
and Service District and water users in the sponsor's
service area shall be assessed the same rate for similar
types of water use. The sponsor is responsible for all
water system related operational and maintenance activities
of the Washakie Rural Improvement and Service District and
the McNutt Improvement and Service District. (Laws 1999,
ch. 16, § 1.)

 

Section 7.  [Amendments to Lander Intake
Rehabilitation Project] W.S. 99-3-404(f) is amended to
read:

 

99-3-404.  Level III construction projects -
rehabilitation.

 

(f)  Project - Lander Water Supply Rehabilitation
Project:

 

(i)  Project sponsor: City of Lander;

 

Page 27

 

 

 

(ii)  Project purpose: Municipal and domestic
water supply;

 

(iii)  Project description: Replacement of an
existing raw and potable water transmission pipeline,
incorporation of a Level II groundwater test well into the
potable water system, a pressure reducing station, air
relief stations, and appurtenances necessary to make the
project function in the manner intended;

 

(iv)  Total project budget: One million six
hundred ninety-six thousand dollars ($1,696,000.00)
Two
million ninety-six thousand dollars ($2,096,000.00)
;

 

(v)  Project loan: The state of Wyoming shall
loan to the sponsor from water development account II
through the commission for the design, permit procurement,
project land procurement, construction engineering and
construction of the project an amount not to exceed eight
hundred forty-eight thousand dollars ($848,000.00)
one
million forty-eight thousand dollars ($1,048,000.00)
or
fifty percent (50%) of the actual development costs,
whichever is less, for a term of twenty (20) years from the
date the commission determines project benefits accrue to
the sponsor, at an annual rate of seven and one-quarter
percent (7.25%);

 

(vi)  Project grant: The state of Wyoming shall
grant to the sponsor from water development account II
through the commission for the design, permit procurement,
project land procurement, construction engineering and
construction of the project an amount not to exceed eight
hundred forty-eight thousand dollars ($848,000.00)
one
million forty-eight thousand dollars ($1,048,000.00)
or
fifty percent (50%) of the actual development costs,
whichever is less;

 

Page 28

 

 

 

(vii)  Appropriation: There is appropriated from
water development account II to the commission one million
six hundred ninety-six thousand dollars ($1,696,000.00)
two
million ninety-six thousand dollars ($2,096,000.00)
or as
much thereof as is necessary to carry out the purpose of
this subsection. Unexpended funds appropriated under this
subsection shall revert to water development account II on
July 1, 2004;

 

(viii)  Special condition: The sponsor shall
purchase the well completed during the Level II study for a
price of  ten thousand two hundred dollars ($10,200.00) or
forty percent (40%) of the actual construction costs,
whichever is less. The sponsor may purchase the well with a
lump sum payment or with amortized payments based on forty
percent (40%) of the actual construction costs for a term
of twenty (20) years from the date the commission
determines project benefits accrue to the sponsor, at an
annual interest rate of seven and one-quarter percent
(7.25%). In either event, a purchase agreement shall be
completed prior to commencement of the project.

 

Page 29

 

 

 

Section 8.  This act is effective immediately upon
completion of all acts necessary for a bill to become law
as provided by Article 4, Section 8 of the Wyoming
Constitution.

 

(END)

 

 

 

 

                                     

Speaker of the House                  President of the Senate

 

                                              

                 Governor                     

                                              

                 TIME APPROVED: _________     

                 DATE APPROVED: _________     

 

I hereby certify that this act originated in the Senate.

 

 

Chief Clerk

 

Page 30