S.F. No. 0105

School capital construction.

 

Sponsored By:        Joint Appropriations Interim Committee

 

AN ACT relating to school facility projects; providing appropriations for school facility projects for the biennium commencing July 1, 2012, and ending June 30, 2014; providing definitions; imposing conditions upon appropriation expenditures; providing for transfers of funds and carryover of funds during this biennium and for the remainder of the 2010-2012 biennium; and providing for effective dates.

 

2/15/2012   Bill Number Assigned

2/16/2012   S Received for Introduction

2/17/2012   S Introduced and Referred to S02

 

ROLL CALL

Ayes:  Senator(s) Anderson, Bebout, Burns, Christensen, Coe, Cooper, Dockstader, Driskill, Emerich, Esquibel, F., Geis, Hastert, Hicks, Hines, Jennings, Johnson, Landen, Martin, Meier, Nicholas, P., Nutting, Perkins, Peterson, Rothfuss, Schiffer, Scott and Von Flatern

Nays:  Senator(s) Barnard and Case

Excused:  Senator(s) Ross

Ayes 27    Nays 2    Excused 1    Absent 0    Conflicts 0

 

2/21/2012   S02 Recommended Do Pass

 

ROLL CALL

Ayes:  Senator(s) Hastert, Meier, Nicholas, P., Peterson and Von Flatern

Ayes 5    Nays 0    Excused 0    Absent 0    Conflicts 0

 

2/21/2012   S Placed on General File

2/21/2012   S Passed CoW

 

SF0105S2001/ADOPTED

Page 7-line 12          Delete "thirty-two million seven hundred" insert "twenty-five million three hundred eighty thousand one hundred forty-three dollars ($25,380,143.00).".

Page 7-line 13          Delete

Page 7-line 14          Delete "($32,780,143.00)".

Page 7-line 22          Delete.

Page 8-after line 7 insert:

"19         Natrona #1  High School       $5,500,000*"

Page 8-line 12          Delete "$32,780,143" insert "$25,380,143".

Page 8-line 22          After "paragraph" delete balance of line.

Page 8-lines 23 and 24  Delete.

Page 9-line 1           Delete line through "349,".

Page 9-after line 8 insert:

"(E)  Notwithstanding 2011 Wyoming Session Laws, Chapter 88, Section 349(b)(viii), the two million dollars ($2,000,000.00) appropriated under subparagraph (B) of this paragraph for the remedy for a high school building under needs index priority 19 in Natrona County School District No. 1 shall be combined with the amounts appropriated by 2010 Wyoming Session Laws, Chapter 39, Section 333, 2011 Wyoming Session Laws, Chapter 88, Section 349, and nine million eight hundred thousand dollars ($9,800,000.00) from previous school capital construction appropriations designated by the school facilities commission for expenditure on high school projects in Natrona County School District No. 1.  Of this combined amount, eleven million five hundred thousand dollars ($11,500,000.00) shall be expended for the design of a remedy to needs index priority 5 and fifteen million dollars ($15,000,000.00) shall be expended for the design of a remedy to needs index priority 19.".

Page 14-line 24         After "," delete balance of line and insert "two hundred eighty-four million nine hundred ninety-four thousand one hundred eighty-four dollars ($284,994,184.00)".

Page 15-line 1          Delete.

Page 15-line 2          Delete through "($284,994,184.00)".

Page 15-lines 14 and 15 Delete.

Page 15-line 23         Delete and insert:

"10         Fremont #2        High School       $ 13,685,000

12          Sweetwater #1     K-12 School       $ 25,207,363

13          Albany #1         High School       $ 62,145,234

14          Fremont #24       K-12 School       $ 45,256,234

15          Sheridan #2       Elementary School $ 14,908,465

Total                                           $281,390,631".

Page 16-lines 8 through 24    Delete and insert:

"(D)  Notwithstanding 2011 Wyoming Session Laws, Chapter 88, Section 349(b)(viii), and in addition to expenditures under subparagraph (c)(ii)(E) of this section, expenditures of amounts appropriated by 2010 Wyoming Session Laws, Chapter 39, Section 333, 2011 Wyoming Session Laws, Chapter 88, Section 349, and nine million eight hundred thousand dollars ($9,800,000.00) from previous school capital construction appropriations designated by the school facilities commission for expenditure on high school projects in Natrona County School District No. 1, shall be for the remedy of needs index priority 5 in Natrona County School District No. 1.".

Page 17-lines 1 through 24    Delete.

Page 18-lines 1 through 12    Delete.

Page 19-line 8          Delete "thirteen million six" insert "thirteen million two hundred twenty-seven thousand two hundred seventy-seven dollars ($13,227,277.00)".

Page 19-line 9          Delete.

Page 19-line 10         Delete "($13,695,420.00)".

Page 19-line 14         After "(d)" delete balance of line and insert "Needs index priorities 16, 17, 19 and 21 for the school districts and projects specified under subparagraph (c)(ii)(B) of this section shall".

Page 19-line 16         Delete "and for the" insert "specified".

Page 19-line 17         Delete "amounts estimated"; delete ":" insert ".".

Page 19-lines 23 and 24 Delete.

Page 20-lines 1 through 6     Delete.

To the extent required by this amendment:  adjust totals; and renumber as necessary.  COE, BEBOUT, ROTHFUSS

 

ROLL CALL

Ayes:  Senator(s) Anderson, Barnard, Bebout, Burns, Case, Coe, Cooper, Dockstader, Driskill, Emerich, Esquibel, F., Hicks, Hines, Martin, Nutting, Rothfuss and Schiffer

Nays:  Senator(s) Christensen, Geis, Hastert, Jennings, Johnson, Landen, Meier, Nicholas, P., Perkins, Peterson, Ross, Scott and Von Flatern

Ayes 17    Nays 13    Excused 0    Absent 0    Conflicts 0

 

2/22/2012   S Passed 2nd Reading

 

SF0105S3001/ADOPTED

Page 1-line 8           Delete "an"; delete "date" insert "dates".

Page 7-line 12          In the Coe, Bebout, Rothfuss second reading amendment (SF0105S2001/A) to this line, delete "twenty-five million three hundred eighty thousand one hundred forty-three dollars ($25,380,143.00)" insert "twenty-five million six hundred eighty thousand one hundred forty-three dollars ($25,680,143.00)".

Page 9-after line 8     In the Coe, Bebout, Rothfuss second reading amendment (SF0105S2001/A) to this line, delete "two million dollars ($2,000,000.00)" insert "five million five hundred thousand dollars ($5,500,000.00)".

Page 14-line 24         In the Coe, Bebout, Rothfuss second reading amendment (SF0105S2001/A) to this line, delete "two hundred eighty-four million nine hundred ninety-four thousand one hundred eighty-four dollars ($284,994,184.00)" insert "two hundred eighty-one million three hundred ninety thousand six hundred thirty-one dollars ($281,390,631.00)".

Page 15-line 10         Delete "Westwood".

Page 15-line 23         In the Coe, Bebout, Rothfuss second reading amendment (SF0105S2001/A) to this line, in line 14 of that amendment, delete "$45,256,234" insert "$45,256,524".

Page 19-lines 19 through 21   Delete.

To the extent required by this amendment:  adjust totals; and renumber as necessary.  COE

 

SF0105S3002/ADOPTED

Delete the Coe, Bebout, Rothfuss Second Reading Amendment (SF0105S2001/A) and the Coe Third Reading Amendment (SF0105S3001/A) entirely.  Further amend as follows:

Page 1-line 8           Delete "an"; delete "date" insert "dates".

Page 7-line 2           After "Previous" insert "(36)".

Page 7-line 3           After "Previous" insert "(?)".

Page 7-line 4           After "Previous" insert "(57)".

Page 7-line 12          After "to" delete balance of line and insert "fifty-two million four hundred twenty-eight thousand eighty-seven dollars ($52,428,087.00)".

Page 7-line 13          Delete.

Page 7-line 14          Delete "($32,780,143.00)".

Page 7-line 21          After "Previous" insert "(42)".

Page 7-line 22          Delete.

Page 7-after line 23    Insert:

"5          Natrona #1        High School/Shared

                               Facility               $ 12,830,287".

Page 8-after line 7     Insert:

"19         Natrona #1        High School/Shared

                               Facility               $ 17,252,267".

Page 8-after line 9     Insert:

"25         Natrona #1        Alternative High

                               School                 $  2,165,390".

Page 8-line 12          Delete and insert:

"Total                                                $ 52,428,087".

Page 8-line 22          After "paragraph" delete balance of line.

Page 8-lines 23 and 24  Delete.

Page 9-line 1           Delete line through second ",".

Page 9-after line 8 insert:

"(E)  Amounts appropriated under subparagraph (B) of this paragraph for the design of remedies for needs index priorities 5 and 19 in Natrona county school district no. 1 shall include three million seven hundred seven thousand three hundred twenty-one dollars ($3,707,321.00) for the design of a shared facility, which shall be inclusive of student enrollments and facility square footages originating from both priority 5 and 19 high school projects.".

Page 14-line 14         After "Previous" insert "(190)".

Page 14-line 16         After "Previous" insert "(134)".

Page 14-line 24         After "to" delete balance of line and insert "two hundred twenty-seven million five hundred eight thousand one dollars ($227,508,001.00)".

Page 15-line 1          Delete.

Page 15-line 2          Delete line through "($285,994,184.00)".

Page 15-line 10         After "Previous" insert "(36)"; delete "Westwood".

Page 15-line 12         After "Previous" insert "(?)".

Page 15-line 13         After "Previous" insert "(42)".

Page 15-lines 14 and 15 Delete.

Page 15-after line 19 insert:

"5          Natrona #1        High School/Shared

                               Facility                $8,262,604*".

Page 15-after line 21   Insert:

"10         Fremont #2        High School             $ 13,685,000

12          Sweetwater #1     K-12 School             $ 25,207,363

14          Fremont #24       K-12 School             $ 45,256,524

15          Sheridan #2       Elementary School       $ 14,908,465

Total                                                 $227,508,001".

Page 15—line 23   Delete.

Page 16-line 8          After "for" insert "needs index priority 5 in".

Page 16-line 9          Delete "County #" insert "county school district no."; delete "facilities" insert "remedies".

Page 16-line 11         Delete "and" insert ",".

Page 16-line 12         After "349(b)(vii)" insert "and nine million eight hundred thousand dollars ($9,800,000.00) from previous appropriations designated by the school facilities commission for expenditure on high school remedies in Natrona county school district no. 1".

Page 16-after line 13 insert and renumber:

"(I)  Twenty-seven million nine hundred thirty-eight thousand six hundred seven dollars ($27,938,607.00) shall be expended for the construction of a shared facility predicated upon student enrollments and square footages originating from the design of remedies for needs index priorities 5 and 19 under subparagraph (c)(ii)(B) of this section and shall not duplicate enrollments and square footages contained within these separate high school remedies;".

Page 16-line 15         Before "The" insert "In combination with the expenditure of amounts appropriated under subsection (d) of this section for needs index priority #19,".

Page 16-line 18         Delete line through "," insert "county school district no. 1,".

Page 17-line 5          After "project" insert "specified under subsection (f) of this section,".

Page 17-line 8          Delete "high school"; after "projects" insert "addressing remedies for needs index priorities 5 and 19".

Page 17-line 12         After "(c)(viii)(B)" insert "and subsection (d)".

Page 17-line 14         Delete "high school"; after "projects" insert "forwarded under this subparagraph, subparagraph (c)(viii)(B) and subsection (d) of this section".

Page 18-line 6          After "under" delete "this".

Page 18-line 7          After "section" insert "and subdivision (I) of this subparagraph".

Page 19-after line 6 insert and renumber:

"(d)  Effective July 1, 2013, up to one hundred nineteen million two hundred thirty-eight thousand three hundred eight dollars ($119,238,308.00) is appropriated from the school capital construction account to the school facilities commission for the high school construction and renovation project addressing needs index priority 19 in Natrona county school district no. 1.".

Page 19-line 8          Delete "(ix)" insert "(e)"; after "to" delete balance of line and insert "sixteen million nine hundred eleven thousand four hundred twenty-two dollars ($16,911,422.00)"; renumber as necessary.

Page 19-line 9          Delete.

Page 19-line 10         Delete "($13,695,420.00)".

Page 19-lines 23 and 24 Delete.

Page 20-lines 2 and 3   Delete.

Page 20-after line 6 insert:

"25         Natrona #1  Alternative High

                              School                        $16,318,523".

Page 23-line 21         Delete "subsection" insert "subsections"; after "(b)" insert "and (c)".

Page 24-line 1          Delete "subsection" insert "subsections"; after "(a)" insert "and (c)".

Page 24-line 4          Delete "(f) and (g)" insert "(h) and (j)".

Page 24-after line 7 insert:

"(c)  Notwithstanding subsections (a) and (b) of this section, subsection (d) of this act is effective July 1, 2013.".  NICHOLAS

 

ROLL CALL

Ayes:  Senator(s) Anderson, Burns, Christensen, Emerich, Esquibel, F., Geis, Hastert, Jennings, Johnson, Landen, Meier, Nicholas, P., Nutting, Perkins, Peterson, Ross, Rothfuss and Scott

Nays:  Senator(s) Barnard, Bebout, Case, Coe, Cooper, Dockstader, Driskill, Hicks, Hines, Martin, Schiffer and Von Flatern

Ayes 18    Nays 12    Excused 0    Absent 0    Conflicts 0

 

2/23/2012   S Passed 3rd Reading

 

ROLL CALL

Ayes:  Senator(s) Anderson, Barnard, Bebout, Burns, Christensen, Coe, Cooper, Dockstader, Driskill, Emerich, Esquibel, F., Geis, Hastert, Hicks, Hines, Jennings, Johnson, Landen, Martin, Meier, Nicholas, P., Nutting, Perkins, Peterson, Ross, Rothfuss, Schiffer, Scott and Von Flatern

Nays:  Senator(s) Case

Ayes 29    Nays 1    Excused 0    Absent 0    Conflicts 0

 

2/23/2012   H Received for Introduction

2/23/2012   H Introduced and Referred to H02

2/24/2012   H02 Recommended Amend and Do Pass

 

ROLL CALL

Ayes:  Representative(s) Berger, Edmonds, Esquibel, K., Harshman, Pedersen, Steward and Wallis

Ayes 7    Nays 0    Excused 0    Absent 0    Conflicts 0

 

2/24/2012   H Placed on General File

 

SF0105HS001/FAILED

Page 7-line 23          Delete "5" insert "Previous (5)".

Page 8-line 9           Delete "19" insert "Previous (19)".

Page 8-line 13          Delete "25" insert "Previous (25)". BERGER, CHAIRMAN.

 

2/27/2012   H Passed CoW

2/28/2012   H Passed 2nd Reading

2/29/2012   H Laid Back Pursuant to HR 9-3

 

SF0105H3001/FAILED  (TO ENGROSSED COPY)

Page 6-lines 17 through 24    Delete and insert:

"(A)  Up to five million four hundred forty-seven thousand six hundred eighty dollars ($5,447,680.00) for the following design projects subject to prescribed maximum amounts:

Needs      
Index       School                                          Maximum
Priority    District         Project                         Amount

Previous    Campbell #1      Alternative High School       $   338,080*

Previous    Crook #1         K-8 School                    $   867,805*

Previous    Park #1          Middle School                 $ 1,739,065

1           Carbon #2        Elementary School             $   526,074

7           Carbon #1        High School                   $ 1,976,656*

Total                                                      $ 5,447,680

(B)  In addition to subparagraph (c)(ii)(A) of this section, up to thirty million twenty-eight thousand forty dollars ($30,028,040.00) for the following design projects subject to prescribed maximum amounts:

Needs      
Index       School                                         Maximum
Priority    District         Project                       Amount

Previous    Laramie #1       Elementary School           $ 1,151,339

Previous    Natrona #1       High Schools/

                             Shared Facility             $24,025,079*

3           Natrona #1       Elementary School           $   325,449

4           Sweetwater #1    Alternative High School     $   537,165

6           Campbell #1      Elementary School           $ 1,597,393

9           Goshen #1        Elementary School           $   308,034

10          Fremont #2       High School                 $   200,000

12          Sweetwater #1    K-12 School                 $ 1,883,581

Total                                                    $30,028,040".

Page 7-lines 1 through 24     Delete.

Page 8-lines 1 through 16     Delete.

Page 8-line 23          Delete ";" insert ".".

Page 9-lines 1 through 19     Delete.

Page 15-lines 14 through 24   Delete and insert:

"(B)  In addition to subparagraph (c)(viii)(A) of this section, up to two hundred forty-four million six hundred eighty-eight thousand eight hundred fifty-seven dollars ($244,688,857.00) for the following capital construction projects subject to prescribed maximum amounts:

Needs      
Index       School                                      Maximum
Priority    District         Project                    Amount

Previous    Campbell #1      Alternative High

 School                   $  8,489,768*

Previous    Crook #1         K-8 School               $ 11,834,299*

Previous    Laramie #1       Elementary School        $ 13,067,503

Previous    Natrona #1       Completion of High

                              Schools/Shared

                              Facility                $ 95,965,201*

1           Carbon #2        Elementary School        $  6,617,937

3           Natrona #1       Elementary School        $ 13,900,370

4           Sweetwater #1    Alternative High
 School                   $  6,149,905

6           Campbell #1      Elementary School        $ 18,080,715

7           Carbon #1        High School              $ 35,172,205

10          Fremont #2       High School              $ 13,885,000

12          Sweetwater #1    K-12 School              $ 21,525,954

Total                                                 $244,688,857".

Page 16-lines 1 through 17    Delete.

Page 17-line 3          Delete line through "in".

Page 17-lines 14 through 22   Delete and renumber.

Page 18-lines 1 and 2   Delete.

Page 18-line 3          Delete line through "," insert "(I)".

Page 18-lines 16 through 18   Delete.

Page 18-line 19         Delete line through "," insert "(II)".

Page 18-line 21         After "separate" insert "high school"; after "projects" delete balance of line.

Page 18-line 22         Delete line through "19".

Page 19-line 2          Delete "and subsection (d)".

Page 19-line 5          After "projects" delete balance of line.

Page 19-line 6          Delete.

Page 19-line 7          Delete "of this section".

Page 19-line 23         After "section" delete line through "subparagraph".

Page 21-lines 1 through 7     Delete and renumber.

Page 21-line 9          After "to" delete balance of line and insert "eleven million eight hundred seventy-five thousand two hundred twenty-three dollars ($11,875,223.00)".

Page 21-line 10         Delete.

Page 21-line 11         Delete "($16,911,422.00)".

Page 21-lines 15 through 24   Delete and insert:

"(e)  School facility needs not receiving design or capital construction funds under paragraphs (c)(ii) and (viii) of this section shall be considered by the school facilities commission in developing its 2013 supplement budget request, together with the results of the evaluation of capacity issues self-reported by school districts and evaluated by the school facilities department.".

Page 22-lines 1 through 5     Delete.

Page 23-line 8          After "period" delete balance of line and insert ", which may be adjusted".

Page 23-lines 9 and 10  Delete.

Page 23-line 11         Delete line through "necessary".

Page 25-line 21         Delete "subsections" insert "subsection"; delete "and (c)".

Page 25-line 24         Delete "subsections" insert "subsection"; delete "and (c)".

Page 26-line 3          After "subsections" insert "(g) and"; delete "and (j)"; after "of" insert "section 1 of".

Page 26-lines 7 through 10    Delete.

To the extent required by this amendment:  adjust totals; and renumber as necessary.  TEETERS

 

3/1/2012    H Passed 3rd Reading

 

ROLL CALL

Ayes:  Representative(s) Barbuto, Berger, Blake, Blikre, Bonner, Botten, Brechtel, Brown, Burkhart, Byrd, Campbell, Cannady, Childers, Connolly, Craft, Davison, Esquibel, K., Freeman, Gingery, Greear, Greene, Harshman, Harvey, Hunt, Illoway, Jaggi, Kasperik, Kroeker, Krone, Lockhart, Loucks, Lubnau, Madden, McOmie, Moniz, Nicholas, B., Patton, Pedersen, Petersen, Petroff, Quarberg, Reeder, Roscoe, Semlek, Steward, Stubson, Throne, Vranish, Wallis, Zwonitzer, Dn. and Zwonitzer, Dv.

Nays:  Representative(s) Buchanan, Edmonds, Eklund, Gay, McKim, Miller, Peasley and Teeters

Excused:  Representative(s) Goggles

Ayes 51    Nays 8    Excused 1    Absent 0    Conflicts 0

 

3/1/2012    Assigned Number SEA No. 0009

3/1/2012    S President Signed SEA No. 0009

3/2/2012    H Speaker Signed SEA No. 0009

3/6/2012    Governor Signed SEA No. 0009

3/6/2012    Assigned Chapter Number

 

Chapter No. 0016  Session Laws of Wyoming 2012